| Pavement Rehabilitation |
English |
Metric |
| |
|
PDF |
PDF |
| RR-1 |
Full-Depth Patch with "EF" joint in PCC |
 | — |
| RR-2 |
Full-Depth Patch PC Concrete Without Dowels (Existing Non-Composite Pavement) |
 | — |
| RR-4 |
Full-Depth Patch PC Concrete With Dowels (Existing Non-Composite Pavement) |
 | — |
| RR-18 |
Full-Depth Patch Continuous Reinforced PCC Pavement Composite Section |
 | — |
| RR-21 |
PCC Crack and Joint Cleaning and Sealing |
 | — |
| RR-23 |
Details for Double Reinforced Pavement over Box Culverts |
 | — |
| RR-24 |
Details for Reinforced Concrete Panel at Box Culverts |
 | — |
| RR-25 |
HMA Wedge for Superelevation |
 |
— |
| RR-26 |
Subbase Patches |
 |
— |