| Miscellaneous |
English |
Metric |
| |
|
PDF |
PDF |
| RK-16 |
Bridge Approach Details (In Conjunction with Bridge Deck Overlay) |
 |
— |
| RK-17 |
PCC Overlay of Reinforced Bridge Approach Section |
 |
— |
| RK-18 |
Bridge Approach Details (Secondary Roads) |
 |
— |
| RK-19A |
Bridge Approach Section (General Details) |
 |
— |
| RK-19B |
Bridge Approach Section (Two Lane) (Abutting PCC Pavement) |
 |
— |
| RK-19C |
Bridge Approach Section (Two Lane for Bridge Reconstruction, PCC Pavement) |
 |
— |
| RK-19F |
Bridge Approach Section (At Existing Bridges, PCC Pavement) |
 |
— |
| RK-19G |
Bridge Approach Section (Two Lane, HMA Pavement) |
 |
— |
| RK-19H |
Bridge Approach Section (Two Lane for Bridge Reconstruction, HMA Pavement) |
 |
— |
| RK-19J |
Bridge Approach Section (At Existing Bridges, HMA Pavement) |
 |
— |
| RK-20 |
Double Reinforced 12" Approach |
 |
— |
| RK-21 |
Bridge Approach (Abutting PCC or Composite Pavement) |
 |
— |
| RK-22 |
Bridge Approach (Abutting HMA Pavement) |
 |
— |
| RK-23 |
Bridge Approach (Multi-Lane, Curbed Roadway) |
 |
— |
| RK-25 |
Double Reinforced 10" Approach |
 |
— |
| RK-26 |
Double Reinforced 10" Approach with Variable Depth Paving Notch |
 |
— |
| RK-30 |
Bridge Approach (Abutting Pavement Detail) |
 |
— |