Construction Manual - Chapter 2
Contract Administration
| Chapter | Descriptions |
| Chapter 2 | Table of Contents |
| 2.00 | Project Organization |
| 2.10 | Preconstruction |
| 2.20 | Contract Administration |
| 2.30 | Construction Period |
| 2.40 | Project Review and Audits |
| 2.50 | Contractor Payments and Price Adjustments |
| 2.60 | Construction Forms |
| 2.70 | Release of Temporary Easement (Right of Way Form 636-069) |
| Chapter 2 Appendices | |
| Appendix 2-1 | Definitions |
| Appendix 2-2 | Certificate of Completion of Construction |
| "Registration of Minor, Nonrecurring Use of Water" (DNR Form 20) | |
| Appendix 2-14 | Certified Transcript of Labor Payroll/Statement of Compliance (Form 830176) and Completed Samples |
| Appendix 2-15 | Traffic Control Non-Compliance Flow Chart |
| Appendix 2-20 | Request to Lease Excess Land |
| Appendix 2-27 | Charging of Contract Time |
| Appendix 2-28 | Weekly Report of Working Days for Incentive/Disincentive Clause (Form 830241) | Appendix 2-31 | Change Order Authorization Matrix |
| Appendix 2-33 | Noncomplying Tests or Measurements of Material Incorporated into the Project |
| Appendices 2-34 (A-P) | Price Adjustment Schedules |
| Appendix 2-34(A) | Aggregate Gradation Test Deviation |
| Appendix 2-34(B) | Concrete Slump |
| Appendix 2-34(C) | Concrete Air Content, Water Cement Ratio, Vibrator Frequency, Certified Plant Inspection, & Late Curing Application |
| Appendix 2-34(D) | Bridge Floor Resurfacing and Overlay Projects |
| Appendix 2-34(E) | Out-of-Tolerance Tining |
| Appendix 2-34(F) | Liquid Asphalt Noncomplying Viscosity or Penetration |
| Appendix 2-34(G) | Asphalt Residue Deficiency |
| Appendix 2-34(H) | Asphalt Binder (Noncomplying Dynamic Shear Rheometer) |
| Appendix 2-34(I) | Asphalt Binder (Noncomplying Bending Beam Rheometer) |
| Appendix 2-34(J) | Deviation in Asphalt Binder Content |
| Appendix 2-34(K) | Segregation |
| Appendix 2-34(L) | Steel H-Pile Weight Deficiency |
| Appendix 2-34(M) | Price Adjustment for Asphalt Binder |
| Appendix 2-34(N) | PCC Pavement Edge Damage |
| Appendix 2-34(O) | Erosion & Sediment Control Non-Compliance Flow Chart |
| Appendix 2-34(P) | Noncomplying Asphalt Binder Replacement (Failure to Bump Grade) |
| Appendix 2-35 | Sample Fuel Adjustment Worksheet - English |
| Appendix 2-36.1 | Construction Project Documentation Checklist |
| Appendix 2-36.2 | Final Project Quantities Letter Format |
| Appendix 2-37 | As-Built Adhesive Backed Standard Format Samples: |