Division 8 Table of Contents

 

Section 8010 - Traffic Signals

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Underground

 

2.02      Detection

 

2.03      Communications

 

2.04      Cabinet and Controller

 

2.05      Poles, Heads, and Signs

 

Part 3 - Execution

 

3.01      Underground

 

3.02      Detection

 

3.03      Communications

 

3.04      Cabinet and Controller

 

3.05      Poles, Heads, and Signs

 

3.06      Temporary Traffic Signal

 

3.07      Surface Restoration

 

3.08      Signal Turn On

 

3.09      Testing

 

3.10      Documentation

 

3.11      Traffic Signal Removal

 

Figures

 

8010.101            Cabinet Footing Details

 

8010.102            Traffic Signal Pole Foundation

 

8010.103            Conduit and Precast Handholes

 

8010.104            Inductive Loop Vehicle Detectors

 

8010.105            Mast Arm Pole Details

 

8010.106            Pedestal Pole Details

 

8010.107            Wood Post Span Assembly

 

Section 8020 - Pavement Markings

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Construction

 

Section 8030 - Temporary Traffic Control

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      General

 

2.02      Signs

 

2.03      Channelizing Devices

 

2.04      Miscellaneous Products

 

2.05      Equipment

 

2.06      Flaggers

 

Part 3 - Execution

 

3.01      Installation

 

3.02      Maintenance

 

3.03      Quality Control

 

Figures

 

8030.101            Temporary Traffic Control General Information

 

8030.102            Work off of Pavement with Minor Encroachment onto Traveled Way

 

8030.103            Work in Center of Low Volume Street

 

8030.104            Lane Closure on Low Volume Street (Self-Regulating)

 

8030.105            Lane Closure for Short-Term or Moving Operations Using a Single Flagger

 

8030.106            Lane Closure on Two-Lane Road Using Two Flaggers

 

8030.107            Work in Vicinity of Roadway-Rail Grade Crossing

 

8030.108            Traffic Control for Outside Lane Closure of Street with Continuous Left Turn Lane

 

8030.109            Traffic Control for Closure of Continuous Left Turn Lane

 

8030.110            Lane Closure on Multi-Lane Street

 

8030.111            Lane Closure at an Intersection

 

8030.112            Lane Closure on the Far Side of an Intersection

 

8030.113            Closure of Turn Lane

 

8030.114            Closure in Center of Intersection

 

8030.115            Moving Operations on Two Lane Roads

 

8030.116            Street or Road Closure

 

8030.117            Sidewalk Detour

 

8030.118            Sidewalk Diversion

 

8030.119            Closure of Marked or Unmarked Crosswalk

 

Section 8040 - Traffic Signs and Posts

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      General

 

2.02      Signs

 

2.03      Posts

 

2.04      Fastening Accessories

 

Part 3 - Execution

 

3.01      Installation

 

3.02      Quality Control