Construct PCC base course to the dimensions shown in the contract documents.
Apply Article 2301.02.
Apply Section 2301 with the following exceptions:
A. Use Class A or Class C concrete, or the mixture used in the mainline paving.
B. The tolerance, when checked with a surface checker, shall be 0.25 inch in 10 feet.
C. If an asphalt surface is a part of the contract, a dark colored curing compound may be used.
D. The base may be opened to shouldering operations, traffic, or surfacing after it has attained an age of 72 hours and a flexural strength of 500 psi.
E. Saw and seal joints according to Section 2122 when constructing PCC paved shoulder. Joints need not be sealed for a PCC base course.
Measurement for Portland Cement Concrete Base will be according to Article 2301.04, A.
Payment for Portland Cement Concrete Base will be according to Article 2301.05, A.