Electronic Reference Library
Standard Road Plans - TC Series
Traffic Control
English
Metric
PDF
PDF
General
TC-1
Work Not Affecting Traffic
—
TC-30
Closure of Continuous Two-Way Left Turn Lane (TWLTL)
—
TC-61
Two-Lane, Two-Way Operation
—
TC-62
Permanent Two-Lane to Four-Lane Transition
TC-81
Restricted Width Signing
Two-Lane Roadways
TC-202
Shoulder Closure
—
TC-203
Aerial Seeding Operations
—
TC-211
Spot Location Lane Closure with Stop Signs
TC-212
Spot Location Lane Closure with Flaggers
TC-213
Lane Closure with Flaggers
TC-214
Lane Closure with Flaggers for use with Pilot Car
TC-216
Lane Closure with Signals
TC-217
Lane Closure with Signals and TBR
TC-228
Lane Closure Utilizing Continuous Two-Way Left Turn Lane
TC-231
Slow Moving Vehicle Operations in the Traffic Lane
TC-232
Shoulder Rumble Strip Operations
TC-233
Pavement Marking Operations
TC-251
Temporary Road Closure
TC-252
Road Closure
TC-253
Paved On-Site Detour
TC-271
Signalized Equipment Crossing
TC-272
Unsignalized Equipment Crossing
TC-273
Construction Site Entrance
TC-282
Uneven Lanes
TC-283
Surveying Operations
Multi-Lane Roadways
TC-402
Shoulder Closure
—
TC-403
Aerial Seeding Operations
TC-416
Partial Lane Closure on Ramps
TC-417
Ramp Closure
TC-418
Lane Closure on Divided Highway
TC-419
Lane Closure on Undivided Highway
TC-420
Lane Closure at Ramps
TC-421
Lane Closure with TBR
TC-422
Closure of Two Adjacent Lanes on Divided Highway
TC-423
Closure of Two Adjacent Lanes on Undivided Highway
TC-429
Closure of Continuous Two-Way Left Turn Lane and/or Adjacent Lane
TC-431
Slow Moving Vehicle Operating in the Traffic Lane
TC-432
Shoulder Rumble Strip Operations
TC-433
Pavement Marking Operations
TC-451
Temporary Road Closure on Divided Highway
TC-454
Temporary Detour Using Ramps on Divided Highway