| Chapter |
Descriptions |
| Chapter 8 |
Table of Contents |
| 8.00 |
Tables and Report Forms |
| 8.10 |
Acceptance and Testing |
| 8.20 |
Measurements and Payment Computations |
| 8.30 |
Equipment Use and Inspection |
| 8.40 |
General Construction |
| 8.50 |
Base, Intermediate, and Surface Courses |
| 8.60 |
Rumble Strips in HMA Shoulders |
| 8.70 |
Inpector's Guide - HMA Paving & Resurfacing |
| 8.80 |
Use of Special Equipment |
| Chapter 8
Appendices |
| Appendix 8-1 |
Longitudinal Joint Orientation |
| Appendix 8-2 |
Recommended Minimum Laydown Temperature |
| Appendix 8-3 |
"Daily HMA Plant Report" (Form 800241) |
| Appendix 8-4 |
"Asphalt Paving Field Inspection Checklist" |
| Appendix 8-5 |
"Iowa DOT HMA Field Report" |