|
CHAPTER 6 GRADING |
|
|
|
|
|
6.00 |
GENERAL GRADING INSTRUCTIONS |
|
6.01 |
ROAD CROSSING FOR CONSTRUCTION EQUIPMENT |
|
6.02 |
GEOTECH TOOLS |
|
6.10 |
SITE PREPARATION |
|
6.11 |
CLEARING AND GRUBBING |
|
|
Threatened and Endangered Bats |
|
|
Emerald Ash Borer |
|
|
Disposal of Waste |
|
|
Area Clearing |
|
|
Selective Clearing |
|
|
Preliminary Estimate for Clearing Right of Way (Form 650014) |
|
|
Method of Payment |
|
6.12 |
REMOVAL AND DISPOSAL OF OLD PAVEMENT |
|
6.13 |
DISPOSAL OF HOT MIX ASPHALT PAVEMENT |
|
6.14 |
DEMOLITION WASTE |
|
6.20 |
TOPSOIL |
|
6.21 |
STRIPPING, SALVAGING, AND SPREADING |
|
|
Monitoring Topsoil Removal |
|
|
Topsoil on Roadway Cuts and Embankments |
|
|
Cultural Resource Protection |
|
|
Payment for Topsoil |
|
6.30 |
EXCAVATION |
|
|
Class 10 |
|
|
Class 12 |
|
|
Class 13 |
|
|
Select Soils |
|
6.31 |
PEAT EXCAVATION |
|
|
Total Removal of Peat |
|
|
Partial Removal of Peat |
|
6.32 |
ROCK EXCAVATION |
|
6.33 |
USE OF AND PAYMENT FOR WATER USED FOR EXCAVATION AND EMBANKMENT |
|
6.34 |
ALTERNATE BORROW AREAS AND CONTRACTOR FURNISHED BORROW |
|
|
Alternate Borrow |
|
|
Contractor Furnished Borrow |
|
6.35 |
PRESERVATION OF CULTURAL RESOURCES |
|
|
Alternate Borrow Areas and Contractor Furnished Borrow |
|
6.36 |
WASTE AREAS |
|
6.40 |
EMBANKMENT |
|
|
EMBANKMENT CONSTRUCTION |
|
|
Equipment – Soil Compaction Roller |
|
|
Site Preparation |
|
|
Deposition of Embankment Material |
|
|
Compaction |
|
|
Special Compaction of Subgrade |
|
|
Subgrade Treatment |
|
|
Construction of Embankment Toe Berms |
|
|
Construction of Bridge Approach Fills |
|
|
Embankment in Place |
|
|
Payment for Water for Embankment Construction |
|
|
Finishing |
|
6.42 |
OVERHAUL |
|
6.43 |
SETTLEMENT PLATES |
|
|
General |
|
|
Guidelines for Installation and Monitoring of Settlement Plates |
|
6.50 |
PIPE CULVERTS BY THE GRADING CONTRACTOR |
|
6.51 |
MATERIAL |
|
6.52 |
PIPE INSTALLATION |
|
|
Excavation |
|
|
Bedding |
|
|
Joints |
|
|
Backfilling |
|
6.53 |
CULVERT ABANDONMENT |
|
6.54 |
LOAD LIMITS OVER CULVERTS |
|
6.55 |
DEFLECTION TESTING OF POLYETHLENE (PE) PIPES |
|
6.60 |
SUBDRAINS |
|
6.61 |
TILE RELOCATION |
|
6.62 |
BACKSLOPE DRAINS |
|
6.63 |
LONGITUDINAL DRAINS |