CHAPTER 5 SAFETY |
|
|
|
|
|
5.00 |
SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION |
|
5.01 |
RESPONSIBILITY OF CONTRACTOR |
|
|
Postings |
|
5.02 |
RESPONSIBILITY OF CONTRACTING AUTHORITY |
|
|
Safety of the Inspection Staff |
|
5.10 |
EMPLOYEE RIGHT‑TO‑KNOW |
|
5.20 |
CONSTRUCTION WORK ZONE TRAFFIC CONTROL |
|
5.21 |
TRAFFIC CONTROL SPECIFICATION REFERENCES |
|
|
ATSSA Quality Guidelines for Temporary Traffic Control Devices & Features |
|
5.22 |
TRAFFIC CONTROL EVALUATION AND CHANGES |
|
5.23 |
CONSTRUCTION ZONE CRASH REPORTING |
|
|
Investigation Procedure |
|
|
Crash Notification Procedure |
|
|
Reporting of Severe Personal Injury and Fatal Crashes |
|
|
Incident Reporting by Contractors |
|
5.24 |
STOP SIGNS ON CONSTRUCTION PROJECTS |
|
5.25 |
“ROAD WORK AHEAD” AND “END ROAD WORK” SIGNS |
|
5.26 |
NO PASSING ZONES ON CONSTRUCTION PROJECTS |
|
5.27 |
CONTRACTOR ACCESS AND EQUIPMENT AND MATERIAL STORAGE |
|
|
Contractor Access |
|
|
Equipment and Material Storage |
|
5.28 |
CONSTRUCTION WORK ZONE SIGNING DURING WINTER SHUTDOWN |
|
|
Uncompleted Projects |
|
|
Multi‑Contract Projects |
|
|
Special Concerns |
|
5.29 |
FLAGGERS & PILOT CARS |
|
|
Bid Item |
|
|
Method of Measurement |
|
|
Trained Flaggers |
|
|
Flagger Price Adjustments |
|
5.30 |
MULTILANE HIGHWAY TRAFFIC CONTROL ISSUES |
|
|
Median Crossings |
|
|
Interstate Lane Closures |
|
|
Traffic Control Removal for Two Lane, Two Way Projects |
|
|
Tubular Markers |
|
5.31 |
DYNAMIC MESSAGE SIGN GUIDELINES |
|
5.32 |
ARROW DISPLAYS |
|
|
Solar Assisted Arrow Displays |
|
|
Vehicle Mounted Light Bars |
|
5.33 |
TEMPORARY BARRIER RAIL |
|
5.34 |
SIGN MOUNTING TYPES |
|
|
U Channel Post |
|
5.35 |
REMOVAL OF TEMPORARY PAVEMENT MARKINGS |
|
|
Pavement Marking Removal Characteristics |
|
|
Disposal of Removed Pavement Marking Materials |
|
5.36 |
NCHRP 350 CRASHWORTHY WORK ZONE DEVICES |
|
5.37 |
INSTALLATION OF TRAFFIC CONTROL ZONES |
|
5.38 |
SIGNALIZED VS FLAGGER CONTROLLED HAUL ROAD CROSSINGS |
|
5.39 |
TRAFFIC CONTROL EVALUATION REPORTING FORM |
|
5.40 |
TRAFFIC QUALITY CONTROL |
|
5.41 |
ROAD CLOSED VS ROAD CLOSED TO THRU TRAFFIC |
|
5.42 |
TEMPORARY WORK ZONE SPEED LIMITS |
|
|
Regulatory Speed Limit Changes Necessary During Construction: |
|
|
Procedure for Changing Regulatory Speed Limit |
|
5.43 |
FLAGGER AND WORKER SAFETY APPAREL (ANSI 107) |
|
5.44 |
MONITORING OF TRANSPORTATION MANAGEMENT PLANS FOR SIGNIFICANT PROJECTS |
|
|
Monitoring the TMP at the Project Level |
|
5.45 |
EXTRA ENFORCEMENT GUIDELINES FOR CONSTRUCTION PROJECTS |
|
5.46 |
VEHICLE WARNING LIGHTS |
|
5.47 |
LANE SHIFTS WITHIN WORK AREAS |
|
5.50 |
TEMPORARY INSTALLATION OF ELECTRICAL POWER LINES |