Division 7 Table of Contents

 

Section 7010 - Portland Cement Concrete Pavement

 

Part 1 - General

 

1.01����� Section Includes

 

1.02����� Description of Work

 

1.03����� Submittals

 

1.04����� Substitutions

 

1.05����� Delivery, Storage, Handling, and Salvaging

 

1.06����� Scheduling and Conflicts

 

1.07����� Special Requirements

 

1.08����� Measurement and Payment

 

Part 2 - Products

 

2.01����� Materials

 

2.02����� Concrete Mixes

 

2.03����� PCC Overlays

 

Part 3 - Execution

 

3.01����� Equipment

 

3.02����� Pavement Construction

 

3.03����� Curb and Gutter Construction

 

3.04����� Overlay Construction

 

3.05����� Pavement Protection

 

3.06����� Use of Pavement

 

3.07����� Transportation Restrictions

 

3.08����� Quality Control

 

Figures

 

7010.101���������� Joints

 

7010.102���������� PCC Curb Details

 

7010.103���������� Manhole Boxouts in PCC Pavement

 

7010.104���������� Ramped Median Nose

 

7010.901���������� PCC Pavement Jointing

 

7010.902���������� PCC Pavement Widening

 

7010.903���������� PCC Railroad Crossing Approach

 

7010.904���������� Typical Jointing Layout

 

7010.905���������� PCC Cul-de-sac Joint Locations

 

7010.906���������� Medians

 

Section 7020 - Hot Mix Asphalt Pavement

 

Part 1 - General

 

1.01����� Section Includes

 

1.02����� Description of Work

 

1.03����� Submittals

 

1.04����� Substitutions

 

1.05����� Delivery, Storage, Handling, and Salvaging

 

1.06����� Scheduling and Conflicts

 

1.07����� Special Requirements

 

1.08����� Measurement and Payment

 

Part 2 - Products

 

2.01����� HMA Materials

 

2.02����� Warm Mix Asphalt Materials

 

2.03����� Recycled Asphalt Materials

 

2.04����� Subgrade and Subbase

 

Part 3 - Execution

 

3.01����� HMA Pavement

 

3.02����� Base Widening

 

3.03����� Protection from Traffic

 

3.04����� Defects or Deficiencies

 

3.05����� Pavement Smoothness

 

3.06����� Quality Control

 

3.07����� Removal of Pavement

 

Figures

 

7020.201���������� Manhole Boxouts in HMA Pavement and HMA Overlays

 

7020.901���������� HMA Pavement

 

7020.902���������� HMA Railroad Crossing Approach

 

7020.903���������� Details for Asphalt Resurfacing

 

Section 7030 - Sidewalks, Shared Use Paths, and Driveways

 

Part 1 - General

 

1.01����� Section Includes

 

1.02����� Description of Work

 

1.03����� Submittals

 

1.04����� Substitutions

 

1.05����� Delivery, Storage, and Handling

 

1.06����� Scheduling and Conflicts

 

1.07����� Special Requirements

 

1.08����� Measurement and Payment

 

Part 2 - Products

 

2.01����� Portland Cement Concrete

 

2.02����� Hot Mix Asphalt

 

2.03����� Brick Pavers

 

2.04����� HMA Setting Bed for Brick

 

2.05����� Neoprene Modified Asphalt Adhesive for Brick

 

2.06����� Brick Joint Filler

 

2.07����� Detectable Warnings

 

2.08����� Granular Driveway Surfacing

 

Part 3 - Execution

 

3.01����� Removals

 

3.02����� Subgrade Preparation

 

3.03����� Adjustment of Fixtures

 

3.04����� PCC Sidewalks, Shared Use Paths, and Driveways

 

3.05����� HMA Shared Use Paths and Driveways

 

3.06����� Brick Sidewalks

 

3.07����� Detectable Warning Installation

 

3.08����� Tolerances for Shared Use Paths and Driveways

 

3.09����� Granular Driveway Surfacing

 

3.10����� Cleaning

 

3.11����� Testing

 

3.12����� Sidewalk and Curb Ramp Compliance

 

Figures

 

7030.101���������� Concrete Driveway, Type A

 

7030.102���������� Concrete Driveway, Type B

 

7030.103���������� Driveway Grading

 

7030.104���������� Right-of-way Grading

 

7030.201���������� Classes of Sidewalks

 

7030.202���������� Curb Details for Class A Sidewalk

 

7030.203���������� Brick Sidewalk

 

7030.204���������� General Features of an Accessible Sidewalk

 

7030.205���������� General Sidewalk and Curb Ramp Details

 

7030.206���������� Curb Ramps Outside of Intersection Radius

 

7030.207���������� Curb Ramp for Class B or C Sidewalk

 

7030.208���������� Alternative Curb Ramp for Class B or C Sidewalk

 

7030.209���������� Curb Ramps for Class A Sidewalk

 

7030.210���������� Detectable Warning Placement

 

Section 7040 - Pavement Rehabilitation

 

Part 1 - General

 

1.01����� Section Includes

 

1.02����� Description of Work

 

1.03����� Submittals

 

1.04����� Substitutions

 

1.05����� Delivery, Storage, Handling, and Salvaging

 

1.06����� Scheduling and Conflicts

 

1.07����� Special Requirements

 

1.08����� Measurement and Payment

 

Part 2 - Products

 

2.01����� Materials

 

Part 3 - Execution

 

3.01����� General

 

3.02����� Full Depth Patching

 

3.03����� Partial Depth Patching

 

3.04����� Diamond Grinding

 

3.05����� Milling

 

3.06����� Crack and Joint Cleaning and Filling, Hot Pour

 

3.07����� Crack Cleaning and Filling, Emulsion

 

3.08����� Pavement Removal

 

3.09����� Curb and Gutter Removal

 

Figures

 

7040.101���������� Full Depth PCC Patches Less Than or Equal to15� Long

 

7040.102���������� Full Depth PCC Patches Greater Than 15� Long

 

7040.103���������� Full Depth HMA Patches

 

7040.104���������� Partial Depth Patches

 

7040.105���������� Flowable Mortar Cutoffwall

 

Section 7050 - Asphalt Stabilization

 

Part 1 - General

 

1.01����� Section Includes

 

1.02����� Description of Work

 

1.03����� Submittals

 

1.04 ���� Substitutions

 

1.05����� Delivery, Storage, and Handling

 

1.06����� Scheduling and Conflicts

 

1.07����� Special Requirements

 

1.08����� Measurement and Payment

 

Part 2 - Products

 

2.01����� Materials

 

Part 3 - Execution

 

3.01����� Equipment

 

3.02����� Re-shaping Ditches

 

3.03����� Prepare / Place Base Material

 

3.04����� Surface Fixture Adjustment

 

3.05����� Application and Mixing of Asphalt Emulsion

 

3.06����� Grade and Compact Material

 

3.07 ���� Surface Treatment

 

Section 7060 - Bituminous Seal Coat

 

Part 1 - General

 

1.01����� Section Includes

 

1.02����� Description of Work

 

1.03����� Submittals

 

1.04����� Substitutions

 

1.05����� Delivery, Storage, and Handling

 

1.06����� Scheduling and Conflicts

 

1.07����� Special Requirements

 

1.08����� Measurement and Payment

 

Part 2 - Products

 

2.01����� Materials

 

Part 3 - Execution

 

3.01����� Equipment

 

3.02����� Surface Preparation

 

3.03����� Heating Bituminous Material

 

3.04����� Spreading Bituminous Material

 

3.05����� Rolling

 

3.06����� Two Course Seal Coats

 

3.07����� Clean Up

 

Section 7070 - Emulsified Asphalt Slurry Seal

 

Part 1 - General

 

1.01����� Section Includes

 

1.02����� Description of Work

 

1.03����� Submittals

 

1.04����� Substitutions

 

1.05����� Delivery, Storage, and Handling

 

1.06����� Scheduling and Conflicts

 

1.07����� Special Requirements

 

1.08 ���� Measurement and Payment

 

Part 2 - Products

 

2.01����� Materials

 

2.02����� Composition of the Slurry Mix

 

2.03����� Mix Design

 

Part 3 - Execution

 

3.01����� Equipment

 

3.02����� Surface Preparation

 

3.03����� Applying Slurry Material

 

3.04����� Slurry Leveling

 

3.05����� Limitations

 

3.06����� Curing and Opening to Traffic