Division 5 Table of Contents
Section 5010 - Pipe and Fittings
Part 1 - General
1.01����� Section Includes
1.02����� Description of Work
1.03����� Submittals
1.04����� Substitutions
1.05����� Delivery, Storage, and Handling
1.06����� Scheduling and Conflicts
1.07����� Special Requirements
1.08����� Measurement and Payment
Part 2 - Products
2.01����� Water Main
2.02����� Bolts for Water Main and Fittings
2.03����� Fittings
2.04����� Concrete Thrust Blocks
2.05����� Pipeline Accessories
2.06����� Special Gaskets
2.07����� Water Service Pipe and Appurtenances
2.08����� Non-shrink Grout
2.09����� Casing Pipe
Part 3 - Execution
3.01����� Pipe Installation
3.02����� Additional Requirements for DIP Installation
3.03����� Additional Requirements for PVC Pipe Installation
3.04����� Additional Requirements for Prestressed Concrete Cylinder Pipe Installation
3.05����� Polyethylene Encasement Installation
3.06����� Tracer System Installation
3.07����� Conflicts
3.08����� Transitions in Piping Systems
3.09����� Structure Penetrations
3.10����� Water Service Stub
3.11����� Testing and Disinfection
Figures
5010.101���������� Thrust Blocks
5010.102���������� Tracer System
5010.901���������� Minimum Clearance Between Water Service and Structure
Section 5020 - Valves, Fire Hydrants, and Appurtenances
Part 1 - General
1.01����� Section Includes
1.02����� Description of Work
1.03����� Submittals
1.04����� Substitutions
1.05����� Delivery, Storage, and Handling
1.06����� Scheduling and Conflicts
1.07����� Special Requirements
1.08����� Measurement and Payment
Part 2 - Products
2.01����� Valves
2.02����� Fire Hydrant Assembly
2.03����� Appurtenances
Part 3 - Execution
3.01����� General
3.02����� Flushing Device (Blowoff)
3.03����� Fire Hydrant
3.04����� Adjustment of Existing Valve Box or Fire Hydrant
Figures
5020.201���������� Fire Hydrant Assembly
Section 5030 - Testing and Disinfection
Part 1 - General
1.01����� Section Includes
1.02����� Description of Work
1.03����� Submittals
1.04����� Substitutions
1.05����� Delivery, Storage, and Handling
1.06����� Scheduling and Conflicts
1.07����� Special Requirements
1.08����� Measurement and Payment
Part 2 - Products
2.01����� Disinfection Agent - Chlorine
Part 3 - Execution
3.01����� Sequence of Testing and Disinfection
3.02����� Initial Flushing
3.03����� Disinfection
3.04����� Final Flushing
3.05����� Pressure and Leak Testing
3.06����� Bacteria Sampling
3.07����� Putting Water Main in Service