Section 2555.� Deliver and Stockpile Salvaged Materials

 

2555.01���� DESCRIPTION.

Deliver and stockpile salvaged materials as tabulated in the contract documents.

 

2555.02���� materials.

None.

 

2555.03���� Construction.

 

A.     The contract documents will identify the quantity of each item to be salvaged, delivery location, and stockpiling requirements.

 

B.��� Salvage without damaging, disassemble, clean, and match mark (if required) items to be stockpiled. Bundle in lots normal to the product being salvaged. Replace items damaged from Contractor�s operations with new materials (at no additional cost to the Contracting Authority).�

 

C.��� Deliver salvaged materials, to the location indentified on the contract documents, during normal business hours. Contact the Engineer to schedule delivery and stockpiling of materials at stockpile site.

 

D.��� Stockpile salvaged materials in an orderly fashion without intermingling. Provide blocking as necessary to ensure items are not in contact with soil.

 

2555.04���� METHOD OF MEASUREMENT.

None. Lump sum item.

 

2555.05���� BASIS OF PAYMENT.

The lump sum price for Deliver and Stockpile Salvaged Materials will be full payment for salvaging, disassembling, cleaning, match marking, bundling, delivering, blocking, and stockpiling.